Geothermal ground loop installation
Construction began on 8/12/08 with the leveling of the lot and excavation for the Geothermal ground loop and water supply has been dug. We are awaiting the delivery of the geothermal pipe on Monday and hope to have the system completed by Tuesday
A short video showing the excavation of the geothermal ground loop. We will be installing a closed horizontal ground loop. Using a slinky loop method. The final clip was shot on Friday 8/15/08, this is a project under construction at this time. We will be have tours of the home at various times during construction for more info about tours go to
                         passive solar

For more videos on the geothermal installation stay tuned they will be posted as the work continues